Mandurah Baptist College – Chiller Relocation & Plant Upgrade

Mandurah Baptist College required the relocation of its existing chiller and plant compound to make way for new classrooms. Complete Refrigeration & Air designed and delivered a fully engineered solution, relocating the plant with new infrastructure, equipment, and controls while ensuring zero downtime and uninterrupted school operations.

Business name

Mandurah Baptist College

Location

Mandurah, WA

Industry

Education

The Problem

The school needed to relocate its chiller and plant compound to allow for new classroom construction. The challenge included underground power feeds and pits, as well as maintaining school operations without disruption.
Chiller and plant compound located on new classroom site
Complex underground power feeds and pits in the area
Requirement for uninterrupted school operations
Risk of delays to construction schedule

The Solution

Complete Refrigeration & Air engineered and constructed a new plant compound with upgraded equipment and controls. The project included new power feeds, chilled water extensions, and relocation of infrastructure.
Designed and built a new compound with pad and walls
Installed new chiller, PLC controls, pumps, and dosing pots
Extended chilled water pipework and new power feed
Coordinated with multiple contractors for efficient delivery

The Outcome

Client Rating

5/5

Recommendation

Mandurah Baptist College recommends Complete Refrigeration & Air for delivering seamless, complex projects under tight timeframes.

Feedback

The project was completed on schedule with no disruption to students or staff.

Complete Refrigeration & Air managed the relocation with precision and professionalism. The work was completed within the school holidays, avoiding disruption, and the new plant has reduced noise and improved reliability. The project enabled us to proceed with new classrooms on time.