Boton Conveyor Services – New Cool Room Installation

Boton Conveyor Services required a large new cool room to support the storage requirements of the rubber used in their conveyor belt manufacturing process. The project took place within an ageing facility, presenting access challenges, electrical upgrades and strict deadlines to ensure operations could be relocated without production disruptions. Complete Refrigeration & Air were engaged to deliver a fully integrated, time-critical solution.

Business name

Location

Jandakot, WA

Industry

Conveyor System Manufacturing

The Problem

Boton needed a large cool room installed within a tight timeframe as part of their factory relocation, with no impact on their manufacturing output. The ageing building created additional complexity, requiring electrical upgrades and coordination of multiple trades.
Tight timelines to avoid disruption to Boton’s conveyor belt production
Multiple switchboards required removal and upgraded power feeds
Coordinating electricians, builders and access works
Ensuring all works could proceed safely within an old facility

The Solution

Complete Refrigeration & Air delivered a cost-effective, deadline-driven solution that was designed to maintain full manufacturing capacity throughout the transition. This included managing multiple contractors and working outside of standard hours to keep the project on track.

Providing a competitive quote aligned with Boton’s timelines

Supply and installation of all cool room panelling to the required dimensions and specification

Switchboard removal and upgraded power feed installation to support the new cool room electrical load

Full coordination of electricians, builders and access contractors throughout the project

After-hours and weekend works completed to maintain programme schedule

The Outcome

The cool room installation was completed on time and fully commissioned, with the system operating reliably from day one. Boton experienced no interruption to production capacity, and plant equipment was able to be moved into the new facility without delay. The project ensured operational continuity and provided the controlled storage environment required for their manufacturing processes.