Alcoa Pinjarra Refinery – Sampling LAB – Custom DX 100% Outside Air HVAC System Replacement

Complete Refrigeration & Air was engaged by UGL Limited to replace failed DX plant equipment at the Pinjarra Alcoa Refinery. The DX plant system provided critical cooling to the onsite laboratory facility. Without adequate cooling, the lab environment could not safely support operational processing activities, making system restoration time-sensitive and essential.

Business name

Location

Pinjarra WA

Industry

Mining & Resources / Industrial Processing

The Problem

The DX cooling plant serving the Alcoa Pinjarra Refinery’s onsite laboratory had failed and therefore restoration was under a tight timeline to ensure continued operations for the client.
Severely restricted access to the DX condenser location
DX evaporator not removable from site, requiring a full dismantle and rebuild in situ
Custom-built condenser unit required to fit the spatial constraints of the available installation position
Time-sensitive restoration – laboratory operations could not safely continue without cooling

The Solution

Complete Refrigeration & Air coordinated with Comm Air to design and manufacture a custom-built DX condenser unit tailored to the spatial constraints of the available installation position.

Full DX evaporator dismantle in situ, using technical manuals to guide the process given the complexity of the in-place rebuild

Evaporator rebuild in situ following new condenser installation

Crane engagement with proper lift planning and execution to safely maneuver the custom condenser into its restricted location

Comprehensive safety procedures implemented throughout in compliance with Alcoa refinery safety standards

Full system recommissioning and performance verification following installation

The Outcome

The custom DX condenser was installed safely, and the DX cooling system was restored to full operation – returning the laboratory to a safe and stable temperature environment
Delivered ahead of schedule
Zero defects recorded
Not a single safety incident on site throughout the works