Coordinated with Comm Air to design and manufacture custom-built equipment tailored to the site’s spatial constraints
Team used the technical manuals to dismantle and rebuild the evaporator as required
Engaged crane services to safely manoeuvre and position the DX condenser into its restricted location
Implemented comprehensive safety procedures in line with refinery standards, ensuring all works were completed without incident recorded